Experience Matters
You can filter your search by typing in an employer name, or selecting a major. This is a great way to see what possibilities are out there!
Co-op at DornerWorks
Major: Electrical Engineering I worked on design, testing, debug, and fixing both the hardware and software of several projects ranging from biomedical to R&D fields.
Co-op Student
Major: Electrical Engineering My first couple of weeks were learning how to read and use AutoCad Electrical schematics as well as a few internal programs to navigate the projects and drawings at Progressive Surface. After I learned the basics I did extensive AutoCad work setting up the core drawing sets for several machines, one of which I was able to follow from conception to construction. After the first month and a half I began setting up CNC's for controlling the robots in the machines. I also was in charge of setting up the PC's for each of the machines and producing the manuals. During my last month I was given a project to find out how to wire a new motor, drive, and power supply together to meet the specs given to me. This included learning to use the supplied software to meet the RPM requirements given certain analog inputs, and the physical wiring itself.
Fun with Controls
Major: Electrical Engineering I was assigned to the headrest launch division where we assemble machines that bend and put notches in the metal headrest tubes. My major task for the winter included: Leading the controls portion of a machine, develop a PLC program for checking motor coasting conditions, take the leading role for a project which GVSU built the control panel and programmed the PLC. Saved the company money, by arranging meetings with salesmen and developed testing procedures for the different products they offered in order to find cheaper products that will produce good results.
R&D with Gill Electronics
Major: Electrical Engineering I did lots of LTspice simulation and Eagle schematic layouts. I researched and developed human presence detection for the wireless charger as well as researching boost converters and battery charging.
Product Developement At Magnum
Major: Electrical Engineering I had quite a few different projects. One was refurbishing a solder paste printer machine from the mid to late 80s. This included figuring out what was wrong with it, how to connect to it, and how ladder logic works. I had to design a board to interface with it and use a DOS emulator to communicate with it. Among other projects I also designed and tested three DC-DC power converters.
My Time As a Controls Engineer
Major: Electrical Engineering While on Co-op with Granco Clark I was placed in charge of 2 primary projects. The most significant of the two has actually gained myself and the company global recognition within our industry. I was tasked with and successful in testing, prototyping, and integrating wireless Bluetooth technology into our machines to allow for completely wireless I/O and communication between machines and the central processor. This made Granco Clark the first industrial automation manufacturer in the world to have integrated such technology into the automated metal extrusion process. It also resulted in a featured article by Light Metals Magazine that highlighted Granco's decision for its integration of wireless communication technology into the field of aluminum/metal extrusion.
Test Engineer
Major: Electrical Engineering I was tasked with maintaining and developing functional testers in the final assembly department. This included streamlining testing to increase throughput, modifying test-methods to reduce scrap, and developing new tests to improve quality. In addition, I was involved with launching new products, which required performing capabilities studies and setting specification limits based on customer specifications. These are just two of many areas that required my attention.
Cleanroom Chronicles III
Major: Electrical Engineering I was assigned a couple of tasks as the semester went on. The main task was to design and manufacture (using in-house machines) a structural extension to an automated arm in order to fit the constraints of the environment it is operated in: a wet bench used in the College of Engineering's cleanroom.
Embedded Systems Engineering Co-Op II
Major: Electrical Engineering I was assigned to the custom logic team for this particular semester. Thus, I became familiar with writing professional VHDL code and I wrote VHDL modules for commonly used modules intended to be used for future SoC designs. Furthermore, I completed simulations to ensure VHDL module behavioral functionality. I also wrote Python and C code for an internally developed custom logic software tool that enabled engineers to conveniently compile VHDL cores. Lastly, I worked on integrating an Aptina camera board with a daughter card and a Stratix IV FPGA. The daughter card and the camera module weren't designed to directly interface with one another; thus, careful board bring-up and testing procedures were performed. PCB modifications were performed as well. I also helped configure the video processing SOPC modules. Moreover, I wrote C code for the embedded NIOSII on the Stratix IV in order to configure the SOPC video modules. SignalTap was used to obtain empirical samples of the internal signals within the video pipeline for debugging purposes.
The JCI Experience
Major: Electrical Engineering Test development in support of Homelink and related testing procedures.
EE - Controls
Major: Electrical Engineering *Designed electrical, pneumatic and hydraulic prints for machines. *Standard electrical codes and practices *Wrote machine PLC logic and programmed HMI screens *Some robot programming *Camera/Vision work (part defect/presence) *In general figured out how hardware worked and how to use it.
Future Gadgets
Major: Electrical Engineering I worked on a product that will be released in a future model car, that I cannot disclose.
Third Engineering Co-op at Johnson Controls
Major: Electrical Engineering I worked on software detail design documentation for software architecture design. I also participated in updating a database and project management documentation maintenance activities.
DornerWorks EE Internship Rotation 1
Major: Electrical Engineering I was placed as a Custom Logic Intern at day one. I had to quickly pick up the basics of Python and C++, as well as become loosely proficient in VHDL, 3 languages of which I'd never done any work in. Some of the main tasks I've completed were writing test cases for a Single Port RAM, and adapting a VHDL Pseudo-Random Number Generator to our libraries and adding functionality to it.
Welding Robot
Major: Electrical Engineering I was assigned to the headrest launch division where we assemble machines that bend and put notches in the metal headrest tubes. My major task for the summer was to help assemble, program the PLC and program the HMI for a Weld Cell that used a robot arm to weld up to six different stations around a 7 sided structure.
Inrad Inc Co-op
Major: Product Design and Manufacturing Engineering I was responsible for monthly maintenance procedures, designing and implementing fixtures, writing, quality assurance and performing testing protocols and other day to day operations as necessary.
First Co-op Semester at Faurecia
Major: Product Design and Manufacturing Engineering While working at Faurecia xWorks in Holland I had the opportunity of working on components of major projects that were already in-progress. I also performed research for new projects and interests. During my semester I was also asked to execute tests of projects that were near completions.
Working at GHSP has Been a Great Experience.
Major: Product Design and Manufacturing Engineering This semester I was tasked with creating a system of visual scheduling for our electronics department. What my boss wanted me to create was a pull system closest to our customer. Currently, our planner schedules the week's products at the first work centers in the electronics area, the SMT's. The products are then arbitrarily forced through the other work centers based on what needs to be finished first. The electronics coordinators walk through the floor every morning and count the parts in progress to determine what we have and what still needs to be done. This leads to certain products sitting and waiting for long periods of time, parts getting misplaced, and inaccurate inventory counts. The pull system I have designed will utilize Kanban cards to move product through the various work centers. I calculated how often we can build the necessary products through the necessary work centers to meet our demand and based a supermarket for our finished goods off this interval. These supermarkets are designed to hold enough products to meet the average daily demand, to supply demand while the supermarkets are being replenished, and then a two day safety buffer. This buffer will slowly decrease as the system improves and there is less error. There is a similar supermarket setup inside the electronics department for the WIP. This is where the product is waiting to be used at some work center. There are two sets of cards that move with the products. One card follows the trays of WIP around the department, tracking its progress. The other set of cards follows the totes of finished goods from the last work center to the finished goods area. The finished goods cards are stored on a board denoting three separate areas. These areas are coded green, yellow, and red. While all of the slots are filled, the finished goods area for that product line is full. Every morning, a coordinator goes out and pulls the number of cards that meet that day's shipments and places them on the previous work centers build board. This signals them to start building certain products from their WIP area. As more cards are removed for shipments, the lower the supermarket gets, and the more into the red the finished goods cards go. This provides a visual way to see how much product is in the supermarket at any given time. As the work station consumes trays of WIP, they remove the WIP cards and place them onto another card board. This WIP card board has the same color coded slots. When a certain level is triggered, the cards are removed and placed at the SMT build board. This triggers the SMT's to start more products to replenish the WIP. The coordinators distribute the cards from this build board to the lines that are ready, or near ready to changeover to a new product. So far my system is only operating for three products from one work center. My boss wanted me to focus and start with these part numbers since they are some of the largest demanded products from our electronics department. There are a few more tweaks to this initial experiment that need to be made before it is rolled out to more work centers. I will continue to work on this part time throughout the summer.
Read More About Working at GHSP has Been a Great Experience.
Magna Mirrors Engineering Co-op
Major: Product Design and Manufacturing Engineering During my first coop at Magna Mirrors I had the pleasure to design two pieces of testing machinery, learn different techniques of finite element analysis and visit General Motors and Chrysler. I had opportunities to immerse myself in a variety of designs, prototype builds and in the field mirror testing.
Vention Medical - 1st Term
Major: Product Design and Manufacturing Engineering I worked mostly investigating and dealing with customer quality complaints, such as assemblies and devices not meeting specifications. Problems were investigated by thoroughly testing each part of the devices. Testing often involved having to design new and unique measurement methods and fixtures. Once the cause of the problems were found, I would help come up with solutions and have them implemented as soon as possible.
Shape Corporation: Intern Experience
Major: Product Design and Manufacturing Engineering Two main projects were assigned to me this semester. One project being an optimization project, where I developed a methodology to minimize mass on a grill housing unit. The part is normally full of ribs, and the program used told us what ribs are necessary. The mass on the part can be greatly reduced while still staying within the stress constraints, displacement constraints, and frequency constraints. I created a document that takes a user step by step through the process and did many presentations to engineers involved with the part as well. The other main project worked on was simulating the forming process of the ends of an aluminum beam. The ends are "crushed" to fit into the design space, but this process leads to high-stress areas. I set up the simulation and post-processed the results. A few smaller projects were worked on as well. Another optimization project to find a light weight high strength beam and several small tasks to help with the work the rest of the CAE team does.
Blackmer Experience
Major: Product Design and Manufacturing Engineering Writing assembly instructions, complete with pictures, for 29 compressor models that Blackmer offers.
First Co-op at Autodie
Major: Product Design and Manufacturing Engineering I was part of the simulation department where I would take the developed parts from Catia CAD software and then placed it in Dynaform. In Dynaform I would mesh up the surfaced blank, post, cavity, and binders then checked for any issues like holes and other defects to the surface. I would setup the specific job and would run the simulation. After the simulation was done, I would open it in ETA Post where I would analyze and put together a report for Chrysler. I completed a project where all the active parts from the program would be simulated by dropping them on the nets described in the GD&T and using a new software we had just gotten. I had to create the net surfaces for each part then mesh them, set it up, simulate it, analysis it, and finally create a report for Chrysler and a PowerPoint for my coworkers on how to use the new software.
Engineering Co-Op 3
Major: Product Design and Manufacturing Engineering I worked mostly with the manufacturing side of CHI implementing lean principles and new manufacturing techniques to their new line of Bliss chairs.
Hands-On and Fast-Moving
Major: Product Design and Manufacturing Engineering I ran production on multiple product lines that included stamping, laser cutting, injection molding, and assembly processes. I also led a team of six other interns in completing projects for the division that would improve machine efficiency or eliminate wasteful steps in weekly processes for the company. I completed projects dealing with machine or operator efficiency by implementing an automated pump system for lubricating oil for a reflector press and creating a standard component for multiple laser cutters that would save operator time when starting new coils of parts. I identified new projects for the team to complete, ordered replacement parts for machines, shipped products, and assisted in updating quality documentation.