On-Campus & Near-Campus Projects - City Campus

The GVSU City Campus is located in the heart of Grand Rapids. We appreciate that our community is improving and expanding, and have compiled some of the on-going projects in the neighborhood to help keep everyone informed. Some projects listed below will be GVSU campus projects (large-scale construction and/or parking lot projects), but we will also share nearby city and road projects as we become aware of them.

Annual Events That May Impact Grand Rapids Campus

Throughout the course of the year there are a few annual events that may close streets near campus for a short period of time:

May: Riverbank Run 2027 Date: Saturday, May 8, 2027

June: Gran Fondo Street Bike Race 2027 Date: Saturday, June 19, 2027

October: GR Marathon, Run The Rapid, Kids Marathon 2027 Dates: Sunday, October 17, 2027 (GR Marathon & Run The Rapids); Saturday, October 16, 2027 (Kids Marathon)


Amway Stadium Project

May 2025 - Spring 2027

230 Winter Ave NW

Amway Soccer Stadium Build; 
Rockford Construction
https://www.rockford.com/projects/amway-stadium

10/1/26: 

CLOSED to Public/OPEN to Businesses: Construction Entrances at Summer Ave. NW & Blumrich St. NW
CLOSED: Parking Lanes on Winter Ave. NW
CLOSED: South Bound Vehicle & Bike Lane on Mount Vernon Ave. NW


Consumers Duct Install

September to end of November, 2026

Front St SW closure south of Pearl NW

https://grandrapids.maps.arcgis.com/apps/instant/sidebar/index.html?appid=f2dcc053809f41fca98bf8ee8055f63f

 

11/9/26: 

Front St NW closure near Grand Rapids Public Museum south of Pearl St for Consumers duct install.


GVSU Blue Dot / Eberhard Center Renovation

Fall 2026 - 2029

301 W Fulton / Eberhard Center

Blue Dot 
https://www.gvsu.edu/bluedot

Project will involve major renovation to existing GVSU Eberhard Center. 

August 2026 - Construction fencing erected


City Campus Parking Lot Enhancements

2026

GVSU City Campus - Parking Lots 

City Campus - Parking Lot
Enhancements (Pew Campus)

Fall 2026 - work to start on Watson and Front Lot parking lot kiosks to complete project.

9/18/26: update: Watson lot south parking lot work will take place from 9/23 to approximately 10/2. Multiple parking spaces near entrance will be closed/coned for duration of the work in this area. Work to involve moving light pole, curb work, parking kiosk installation and partial lot resurfacing/restriping. Work will move to the north end on 10/5 and will take about 10 days to complete (similar scope of coning spaces for curb work, kiosk install and resurfacing/striping).  

10/8/26: updated schedule: 

  • 10/13: existing gate removal, remove existing curb and flatwork, directional bore and hydrovac work 
  • 10/14: Finish directional bore if needed; conduit work.
  • 10/15-10/16: Concrete curbs, flatwork and bump posts
  • 10/19-20: Asphalt patching; allow for weather delays.

Seward Ramp Lighting Project

November 2026

Duration: Approx 2 weeks

520 Lake Michigan Dr NW, 49504

This November we will be changing the light fixtures in the Seward Ramp. The new fixtures will be LED and motion-activated for energy savings. The project will take approximately 2 weeks to complete. The contractors may close off certain areas as needed while they are working, but the ramp will remain open during this project.


Pedestrian Bridge from GVSU Seward Ramp to David Hunting YMCA

Fall 2026 - 2027

Lake Mich Dr NW & Winter NW

Pedestrian Bridge from
GVSU Seward Ramp to
David Hunting YMCA

Still in planning stage. Work will involve road and sidewalk closures near intersection of Lake Michigan Dr NW and Winter Ave NW.