The Zeeland BPW erected two 120', 50 KW wind turbines on the north side
of Helder Park in Holland Township, Michigan. The turbines feature
25-foot blades and generate an estimated 170,000 to 185,000
kilowatt-hours of electricity annually, or enough energy to power 22 homes.